Showing posts with label civil engineering seminar topics. Show all posts
Showing posts with label civil engineering seminar topics. Show all posts

Sunday, 27 March 2016

Three gorges dam report

TABLE OF CONTENTS
CHAPTER 1      Introduction                               …………………………………………………………………………                 1
CHAPTER 2      The Project                                …………………………………………………………………………                 2
CHAPTER 3      Major Environmental, Economic, Social, and Political Issues                          ………………                  3
CHAPTER 4      Economic and Financial Costs    ………………………………………………………………………..                  4
CHAPTER 5      Environmental Impacts               …………………………………………………………………………               5
CHAPTER 6      Fisheries                                     ………………………………………………………………………..                   6        
CHAPTER 7      River Sediment Flow                  …………………………………………………………………………                  7
CHAPTER 8       Flood Protection                       …………………………………………………………………………                  8
CHAPTER 9       Shipping Benefits                                   …………………………………………………………………………                   9
CHAPTER 10     Reservoir                                  …………………………………………………………………………                  10
CHAPTER 11     Relocation and Resettlement   …………………………………………………………………………                  11
CHAPTER 12     Other Issues                               …………………………………………………………………………                  12
CHAPTER 13     Conclusion                                …………………………………………………………………………                  13
CHAPTER 14      References                                  …………………………………………………………………………..                14







TABLE OF FIGURES
Figure 1           The Three Gorges Dam
Figure 2           The Project
Figure 3           The Yangtze River
Figure 4           Financial Costs
Figure 5           Satellite View Of River
Figure 6           Fishing
Figure 7           Effect On Soil
Figure 8           Impact Of Dam On Agriculture
Figure 9           Flood Water
Figure 10         Ship Lift
Figure 11         Ship Locks
Figure 12         Reservoir
Figure 13         Reservoir
Figure 14         Relocation
Figure 15         Resettlement
Figure 16         Submerged Area Issues
Figure 17         Water  Pollution
Figure 18         The Night View Of TheThree Gorges Dam
Figure 19         Three Gorges Dam At Its Fullest


Chapter:-1
images (21).jpg Introduction :-
The Three Gorges Dam (TGD) and associated infrastructure is the largest integrated water project built in the history of the world. It has also been one of the most controversial due to its massive environmental, economic, and social impacts. The very first volume of The World’s Water, published more than a decade ago, reviewed the plans underway at that time to build the Three Gorges Dam, along with many of the expected benefits and costs (Gleick 1998). A decade later, the physical dam itself has largely been completed, although work is continuing on electrical generating systems and a wide range of peripheral projects. This chapter offers an update on the project and a timeline of major events. It is crucial to note that while extensive information on the project is available from authorities and government officials, reliable independent information on environmental and social costs is harder to find (Dai 1994, 1998; Heggelund 2007). This update draws on official materials, as well as information available from non-governmental and non-Chinese sources, to get a clearer snapshot of the project’s complex implications. There are growing indications that very serious problems have started to develop. In the summer of 2007, major western media began to report on growing threats from landslides, pollution, and flooding, as well as growing social and political unrest and dissatisfaction associated with relocating millions of people (Oster 2007, Yardley 2007). Even officials in China have begun to be increasingly outspoken about unresolved challenges associated with the project. Weng Lida, secretary general of the Yangtze River Forum was quoted as saying “the problems are all more serious than we expected” (Oster 2007). In September 2007, Chinese officials “admitted the Three Gorges Dam project has caused an array of ecological ills, including more frequent landslides and pollution, and if preventive measures are not taken, there could be an environmental ‘catastrophe’ “ (Xinhua 2007c). The complex and massive effort to relocate millions of displaced and affected people has also caused a range of social, political, and economic problems. It is impossible to try to judge whether the TGD project will have net costs or benefits. All major water projects have complicated combinations of both costs and benefits that vary over a project’s lifetime and are difficult to evaluate and quantify in a 139 consistent, comparable way. As is typical with such large water projects, the benefits are typically far easier to identify and quantify than the costs, which often only manifest themselves over many years, in complex ways. Calculating actual costs and benefits accurately may never be possible because of the difficulty of putting monetary values on many of the complex environmental, social, and cultural impacts of the project (Tan and Yao 2006). Nevertheless, enough time has gone by, and enough information is available, to begin the process of evaluating the overall implications of the project.
1
Chapter:-2
The Project:-
images (6).jpgThe Three Gorges Dam stretches more than two kilometers across one of the greatest rivers in the world, the Yangtze. The dam was built in a stretch of the Yangtze known as Three Gorges because of the canyons formed by immense limestone cliffs. These gorges— the Xiling, Wu, and Qutang—offer some of the most scenic landscape anywhere in the world and have long been a destination spot for tourists from around the world. In recent years, tourism has boomed as people have rushed to see some of the sights to be destroyed by the dam and reservoir (China View 2008). The beauty of the region has inspired Chinese poets and artists for centuries including much of the work of Li Bai (701–762 AD), considered by many Chinese to be the world’s greatest poet (Fearnside 1988). The idea of building a gigantic dam on the Yangtze River in the Three Gorges area was proposed more than 80 years ago by Sun Yat-sen. After severe flooding along the river in the 1950s, Chairman Mao Tse Tung vowed to speed up construction of a massive dam but nothing significant happened for several more decades. In 1986, the Chinese Ministry of Water Resources and Electric Power asked the Canadian government to finance a feasibility study to be conducted by a consortium of Canadian firms. The consortium, known as CIPM Yangtze Joint Venture, included three private companies (Acres International, SNC, and Lavelin International), and two state-owned utilities (Hydro-Quebec International and British Columbia Hydro International). The World Bank was asked to supervise the feasibility study to ensure that it would “form the basis for securing assistance from international financial institutions” (Adams 1997). On April 3, 1992, the National People’s Congress officially approved the construction of the project. On December 14, 1994, the Chinese government formally began construction. The first electricity was produced in 2003, and the physical dam was mostly completed in 2006. The Three Gorges Dam is nearly 200 meters high, has a volume of 40 million cubic meters, and has created a reservoir 600-kilometer long with a total storage capacity approaching 40 billion cubic meters. Maximum storage of water behind the dam is expected to occur sometime in 2008. The 14 generators in the north side of the dam have already been installed and they reached full capacity (9,800 MWe) on October 18, 2006 after the water level in the reservoir had been raised to 156 meters. Installation of seven generators in the south side of the dam was completed by the end of 2007, bringing the total power capacity to 14,800 MWe, surpassing the generating capacity of the Itaipu Dam (14,000 MWe) in Brazil (Government of China 2006). At its completion, sometime after 2010, the project is expected to have a total installed hydroelectric capacity exceeding 22,000 MWe. This power capacity is higher than originally proposed because of an expansion initiated in 2002. In 2007, the turbines generated around 62 billion kWhr of electricity – about two-thirds of the maximum level expected by the completed project. Other benefits of the project claimed by project designers include 140 The World’s Water 2008–2009 flood protection on the historically dangerous Yangtze River and improvements to river navigation for thousands of kilometers.
                                                                                            2
Chapter:-3
 Major Environmental, Economic, Social, and Political Issues:-
 Economic, environmental, social, and political concerns have been raised about the TGD project, both before the project was launched and in recent years. One of the strongest and most consistent arguments made by project proponents has been that the electricity produced by the dam would otherwise be produced by dirty Chinese coalburning power plants, with their serious environmental impacts. One of the strongest and most consistent arguments made by project opponents has been the vast scale of the environmental and social transformations of the watershed of the Yangtze both upstream and downstream of the dam itself. These major questions are addressed here.


images (10).jpg



                       


                                                                                    3
Chapter:-4
 Economic and Financial Costs :-
images (22).jpgThe total cost of the Three Gorges Dam and associated projects will be enormous, but it is no longer possible to produce any definitive quantitative estimate. Even the financial costs of the infrastructure alone cannot be known because of the magnitude of the expenditures, the related development projects in the region, and expenditures made unofficially. Estimates of the construction costs made during the mid-1990s for the major parts of the project ranged from a low of $25 billion to a high of $60 billion (Dai 1994, China 1996, JPN 1996, McCully 1996, Reuters 1997). The most recent estimates have fluctuated around the upper end of these figures. The TGD is being funded by a complex mix of both internal and external sources. China has identified four internal sources of funds: the State Three Gorges Construction Funds, power revenues from existing hydropower facilities, power revenues from the Three Gorges Project itself, and loans and credits from the Chinese State Development Bank (SDB), now renamed the Chinese Development Bank (CDB). External sources of funding have been critical for the project. International organizations have tried to maintain a list of international financiers and companies supplying equipment and services to the project through the China Three Gorges Project Development Corporation, a state-owned entity set up to finance and build the project (see, especially, Probe International 2008). Canada’s Export Development Corporation, Germany’s export-import bank, and other international export credit agencies provided early loan guarantees for the project totaling hundreds of millions of dollars (Financial Times 1997). Commercial banks and investment firms have offered significant financing assistance. The SDB of China signed a loan package with Germany’s Kreditanstalt Fur Wiederaufbau, Dresdner Bank, and DG Bank in 1997 for the purchase of turbines and generators. Hundreds of millions of dollars in SDB bonds were underwritten at the beginning of the project by a virtual who’s who of the international financial community, including Lehman Brothers, Credit Suisse First Boston, Smith Barney Inc, J.P. Morgan & Co, Morgan Stanley & Co Incorporated, and BancAmerica Securities Inc.



                                                                                        4
Chapter:-5
Environmental Impacts:-
 Much of China’s electricity is produced by thermal power plants burning one of the dirtiest fossil fuels – coal. The Chinese government estimates that if the electricity generated by the Three Gorges project were produced instead with Chinese coal, 50 million more tons of coal would be burned annually, producing 100 million tons of carbon dioxide, 1.2–2 million tons of sulfur dioxide, 10,000 tons of carbon monoxide, and large quantities of particulates (China 1996, Xinhua 2007a). Government officials also point to efforts to remove polluting enterprises from the edge of the river or reservoir, and their construction of sewage treatment facilities to improve water quality in the Three Gorges reservoir region, although they note that eutrophic conditions and algal blooms continue to occur throughout the basin (People’s Daily Online 2007). In addition, while massive funding has been committed to the dam itself, much of the proposed spending on pollution control has not yet occurred. Officials estimate that about 40 billion yuan will be spent to build at least 150 sewage treatment plants and 170 urban garbage disposal centers, but many of these are not yet complete (China Daily 2007a). The city of Chongqing alone still releases nearly one billion tons of untreated wastewater into the Three Gorges reservoir every year (Hodum 2007).
images (17).jpg




                                                                                                                5
Chapter:-6
Fisheries :-
https://www.mtholyoke.edu/~lpohara/Pol%20116/Images/europeanspaceagency.jpgImpacts Ecological problems have been projected to occur as a result of the construction of the dam and modification of the watershed, including impacts on the fisheries of the Yangtze River basin. This basin has 36 percent of all freshwater fish species in China, with more than 360 fish species belonging to 29 families and 131 genera (Xie 2003). Twenty-seven percent of all of China’s endangered freshwater fish are in the Yangtze basin, and there are as many as 177 endemic fish species (Yue and Chen 1998). Major changes in fish populations have been anticipated because the project is altering the dynamics of the river, the chemical and temperature composition of the water, and the character of the natural habitat and food resources available for these fish species. The dam itself blocks migration of fish and access to spawning grounds, and these impacts will be imposed on top of other significant modifications to the Yangtze that have already caused declines in fisheries. In 1981, the Chinese completed the construction of the Gezhou Dam 40 kilometers downstream from the TGD site. That was followed by rapid and sharp declines in the populations of three of China’s famous ancient fish species, the Chinese sturgeon, River sturgeon, and Chinese paddlefish, each of which is now listed as endangered (Xie 2003). Of special concern is the Chinese freshwater dolphin, which may already be extinct (Hance 2008). Fisheries in the upper watershed are also at risk. A study in 2003 identified six species at high risk 142 The World’s Water 2008–2009 of complete extinction, another 14 with an uncertain future, and two dozen more that may only survive in tributaries to the Yangtze (Park et al. 2003). Fisheries are already beginning to show the effects of altered river ecology below the dam. Data released to a Three Gorges Dam monitoring program website indicate that commercial harvests of four species of carp are well below pre-dam levels (Xie et al. 2007)










                                                                                        6
Chapter:-7
images (24).jpgRiver Sediment Flow:-
images (23).jpg The dam is also having a significant impact on sediment loads in the Yangtze. The Yangtze River has traditionally carried a vast load of sediment from its upper reaches of the watershed to the East China Sea, supporting ecological processes in the river delta and the productivity of fisheries in the Sea. This sediment load has varied with annual climatic factors, and more significantly, with the level of deforestation, and subsequent reforestation in the upper watershed. The completion of the Three Gorges Dam, however, has led to a rapid and significant decrease in downstream sediment load. Sediment volumes have been declining from the late 1990s due to reforestation efforts and the construction of many small- and intermediate-sized dams on Yangtze River tributaries. In 2003, the closure of the Three Gorges Dam caused a further severe decrease. Sediment load at Datong, near the Yangtze’s delta dropped to only 33 percent of the 1950–1986 levels (Xu et al. 2006). Among the consequences of this drop in sediment are growing coastal erosion and a change in the ecological characteristics and productivity of the East China Sea (Xu et al. 2006).











                                                                                        7
Chapter:-8
 Flood Protection :-
A major anticipated benefit of the project is improved flood protection on the middle and lower reaches of the Yangtze River. Historically, people living along the Yangtze River have suffered tremendous losses from flooding. In 1931, 145,000 people drowned, and over 300,000 hectares of agricultural land flooded. In 1954, 30,000 more died in Yangtze floods or the subsequent diseases (Boyle 2007). In 1998, a flood in the same area caused billions of dollars of damage. More than two thousand square kilometers of farm land was flooded, and over 1,500 people were killed (CTGPC 2002). The Chinese government has already claimed flood benefits to the dam. According to Li Yongan, the general manager of the Yangtze Three Gorges Project Development Office, the project averted floods in late July 2007 by storing waters that would have exceeded flood levels below the dam (People’s Daily Online 2007), though the overall long-term flood-control benefits provided by the Three Gorges Dam are only likely to be determined over the next several decades as a wider range of high flows are experienced.
images (20).jpg




                                                                                    8
Chapter:-9
Shipping Benefits:-
images (7).jpg The Yangtze River, China’s “golden waterway,” plays an important role in the economy of the upper river area. In that region, river navigation is almost the only means of long-distance, cost-effective transportation of freight. For Chongqing, the major port city in Sichuan province, 90 percent of goods are transported by water, and navigation on the upper Yangtze has been difficult in the past. The Three Gorges reservoir dramatically increases the depth of water and improves navigation up to Chongqing, more than 600 kilometers upstream of the dam. Three Gorges has been built with one of the largest systems of ship locks in the world, permitting large quantities of cargo to move into the upper reaches of the Yangtze. In 2006, 50 million tons of cargo passed through the new lock system up to Chongqing, up from 18 million tons before the dam, and the 2007 estimate exceeds 50 million tons (Peoples Daily Online 2007).
images (19).jpg












                                                                                                                9
Chapter:-10
Reservoir:-
Image result for three gorges dam reservoirImage result for three gorges dam reservoirInduced Seismicity and Geological Instability Large reservoirs can cause seismic events as they fill and as the pressure on local faults increases (ICE 1981). Such reservoir-induced seismicity was predicted for the Three Gorges region, which is already seismically active and indeed, there has been an increase in reported seismic activity in the region following construction of the dam and the filling of the reservoir. Official statements minimize the importance of this, saying that “no unusual phenomena which could disrupt the stability of Three Gorges Dam have occurred” – a far cry from saying that there have been no significant damages to individuals, homes, or businesses (People’s Daily Online 2007). Related to the risk of increased seismic activity is the risk of increased landslides in the regions around Three Gorges with steep slopes. Landslide activity associated with the filling of the reservoir appears to be on the rise. Very soon after the closing of the dam and the filling of the reservoir, a major landslide occurred near the town of 144 The World’s Water 2008–2009 Qianjiangping on the Qinggan River near its confluence with the Yangtze mainstream. Early on the morning of July 13, 2003, 24 million cubic meters of rock and earth slid into the Qinggan River, completely blocking its flow, capsizing 22 boats, and destroying four factories, 300 homes, and more than 67 hectares of farmland. Official reports say that 14 people were killed and 10 more were listed as missing (Wang et al. 2004). In 2007, thirty-one people died when a landslide on a tributary to the dam in Hubei province crushed a bus (Stratton 2007). The risk of such disruptions appears to be far more severe than anticipated and is leading to new resettlement efforts as the danger zones around the margins of the reservoir expand. In the fall of 2007, officials and experts admitted the Three Gorges Dam project had caused more frequent landslides (Xinhua 2007b,c).

                                                                                        10

Chapter:-11
 Relocation and Resettlement:-
download.jpgImage result for three gorges dam relocation area on map Every large dam built in China has led to the resettlement of local people because of the high populations and the density of towns and villages along the major rivers. Even early in the debate over Three Gorges, the Chinese Academy of Sciences (1988, 1995) acknowledged that large-scale resettlement and inundation of population centers would be among the most devastating aspects of the project. Initial estimates of the populations to be displaced varied from around one million to almost two million. Far more than a million people have already been resettled during the project’s construction – official estimates typically say “at least 1.2 million” or “1.13 million” (Yardley 2007). Other estimates range from 1.3 million to almost 2 million (Dai 1998, Chao 2001, Tan and Yao 2006). More than 100 towns are ultimately to be submerged, including the major population centers of Fuling, Wanxian, and parts of Chongqing. Chongqing is the central municipality in the Three Gorges reservoir area and recently received approval to become a centrally administered municipality – only the fourth in the country after Beijing, Shanghai, and Tianjin. Fourteen thousand hectares of agricultural land will be submerged, as will more than 100 archeological sites, some dating back over 12,000 years. The cities of Wanxian and Fuling have cultural histories extending back more than 1,000 years. In fact, it now appears possible that as many as six million people in total will have to be resettled because of the dam and surrounding impacts.
                                                                                                11

Chapter:-12
Other Issues:-
Image result for three gorges dam other issuesImage result for three gorges dam other issues The long-term implications of the TGD will only be understood fully over the coming decades. But it is likely to have some unanticipated implications, beyond the signifi- cant effects already predicted or observed. Some of these are already beginning to appear: The magnitude of the dam and reservoir are so large that it is already playing a role in military planning and in affecting local climatic conditions. In 2004, the U.S. Pentagon released their annual report to Congress on military issues related to China. In that report, the Pentagon reported that Taiwanese leaders were considering the concept of targeting the Three Gorges Dam militarily as a deterrent against Chinese military action against Taiwan. They wrote: “Taipei political and military leaders have recently suggested acquiring weapon systems capable of standoff strikes against the Chinese mainland as a cost-effective means of deterrence. Taiwan’s Air Force already has a latent capability for airstrikes against China. Leaders have publicly cited the need for ballistic and land-attack cruise missiles. Since Taipei cannot match Beijing’s ability to field offensive systems, proponents of strikes against the mainland apparently hope that merely presenting credible threats to China’s urban population or high-value targets, such as the Three Gorges Dam, will deter Chinese military coercion.” (U.S. Department of Defense 2004). This comment was taken by mainland Chinese media and political leaders as a direct threat, or as an effort to encourage Taiwan military to develop such capability, and provoked an angry response (Hogg 2004). people. 1932 Nationalist government proposes building a low dam at Three Gorges. 1935 Massive flooding kills 142,000 people. 1940s The U.S. Bureau of Reclamation helps Chinese engineers identify a site.

                                                                                        12

Chapter:-13
Conclusion:-
images (1).jpgdownload (1).jpgThe Three Gorges Dam in China is rapidly approaching completion. This project, along with a vast array of peripheral projects, constitutes the largest water-supply development in the history of humanity. As with any major construction project that substantially modifies or alters a watershed, the Three Gorges Dam will have significant costs and benefits. Among the most significant benefits are the generation of electricity without greenhouse gas emissions, improvements in navigation, and potential reductions in flood risk. Among the most significant costs are massive dislocations of millions of Chinese to make way for the dam and reservoir, further ecological degradation of the Yangtze River ecosystem and fisheries, a reduction in sedimentation reaching the East China Sea, and a growing risk of new landslides and reservoir induced seismicity. Over decades, the overall implications of the project will become more evident, but before the full benefits have begun to be delivered, the environmental, social, political, and economic costs are beginning to accumulate. Even official government spokesmen are beginning to question the substantial human and environmental costs of the project, while other officials are moving rapidly forward on new massive water infrastructure elsewhere in China, without having learned the lessons from Three Gorges. Long-term sustainable water management in China will require a better balancing of the true costs and benefits of their water choices.
Three gorges dam has  set new benchmark in construction engineering. And has pushed engg. To its new limits. So it an ultimate mega structure unless an another bigger is built.
                                                                                    13

Chapter:-14
 REFERENCES:-
 Adams, P. 1997. Planning for disaster: China’s Three Gorges Dam.
http://www.multinationalmonitor.org/hyper/issues/1993/09/mm0993_08.html
 Boyle, C.E. 2007. Water-borne Illness in China. China Environmental Health
Project, Research Brief. Washington, D.C.: Woodrow Wilson International Center for Scholars. August 2007
. Carrell, S. 2004. HSBC under fire for its role in £870m bond sale to finance China’s megadams.
The Independent, July 25. Chao, J. 2001. Relocation for giant dam inflames Chinese peasants. National Geographic News, May 15, 2001.

















                                                                                        14

Friday, 26 February 2016

The Millau Viaduct : tallest bridge

The Millau Viaduct (French: le Viaduc de Millau, IPA: is a cable-stayed bridge that spans the valley of the River Tarn near Millau in southern France.

Designed by the French structural engineer Michel Virlogeux and British architect Norman Foster, it is the tallest bridge in the world with one mast's summit at 343.0 metres (1,125 ft) above the base of the structure. It is the 15th highest bridge deck in the world, being 270 metres  (890 ft)between the road deck and the ground below.The Millau Viaduct is part of the A75-A71 autoroute axis from Paris to Béziers and Montpellier. The cost of construction was approximately €400 million. It was formally inaugurated on 14 December 2004, and opened to traffic on 16 December. The bridge has been consistently ranked as one of the great engineering achievements of all time. The bridge received the 2006 International Association for Bridge and Structural Engineering Outstanding Structure Award.

History
Because of problems with traffic on the route from Paris to Spain along the stretch passing through the Tarn valley near the town of Millau, leading to congestion in the summer from holiday  traffic, construction of a bridge to span the valley was required. The first plans were discussed in 1987 by CETE, and by October 1991, the decision was made to build a high crossing of the Tarn River by a structure of around 2,500 m (8,200 ft) in length. During 1993–1994 the government consulted with seven architects and eight structural engineers. During 1995–1996, a second definition study was made by five associated architect groups and structural engineers. In January 1995, the government issued a declaration of public interest to solicit design approaches for a competition. In July 1996, the jury decided in favour of a cable-stayed design with multiple spans, as proposed by the Sogelerg consortium (Michel Virlogeux and Norman Foster). The decision to proceed by grant of contract was made in May 1998; then in June 2000 the contest for the construction contract was launched, open to four consortia. In March 2001 Eiffage established the subsidiary Compagnie Eiffage du Viaduc de Millau (CEVM) and was declared winner of the contest and awarded the prime contract in August.
Possible routes

Routes of the four projects of the A75 autoroute around Millau
In initial studies, four options were examined:

Great Eastern (grand Est) ( yellow route ) passing east of Millau and crossing the valleys of the Tarn and Dourbie on two very high and long bridges (spans of 800 and 1,000 m or 2,600 and 3,300 ft) whose construction was acknowledged to be problematic. This option would have allowed access to Millau only from the Larzac plateau, using the long and tortuous descent from La Cavalerie. Although this option was shorter and better suited to through traffic, it did not satisfactorily serve the needs of Millau and its area . Great Western (grand Ouest) ( black route ), longer than the eastern option by 12 km (7.5 mi), following the Cernon valley. Technically easier (requiring four viaducts), this solution was judged to have negative impacts on the environment, in particular on the picturesque villages of Peyre and Saint-Georges-de-Luzençon. It was more expensive than the preceding option, and served the region badly. Near RN9 (proche de la RN9) ( red route ), would have served the town of Millau well, but presented technical difficulties and would have had a strong impact on existing or planned structures. Intermediate (médiane), west of Millau ( blue route ) was supported by local opinion, but presented geological difficulties, notably on the question of crossing the valley of the Tarn. Expert investigation concluded that these obstacles were not insurmountable.
The fourth option was selected by ministerial decree on 28 June 1989.  It encompassed two possibilities:

the high solution, envisaging a 2,500 m (8,200 ft) long viaduct more than 200 m (660 ft) above the river; the low solution, descending into the valley and crossing the river on a 200 m (660 ft) long bridge, then a viaduct of 2,300 m (7,500 ft) extended by a tunnel on the Larzac side.
After long construction studies by the Ministry of Public Works, the low solution was abandoned because it would have intersected the water table, had a negative impact on the town, cost more, and lengthened the driving distance. The choice of the "high" solution was decided by ministerial decree on 29 October 1991.

After the choice of the high viaduct, five teams of architects and researchers worked on a technical solution. The concept and design for the bridge was devised by French designer Michel Virlogeux. He worked with the Dutch engineering firm ARCADIS, responsible for the structural engineering of the bridge.
Choosing the definitive route

Satellite image of the route before construction of the bridge
The "high solution" required the construction of a 2,500 m (8,200 ft) long viaduct. From 1991 to 1993, the structures division of Sétra, directed by Michel Virlogeux, carried out preliminary studies and examined the feasibility of a single structure spanning the valley. Taking into account technical, architectural and financial issues, the Administration of Roads opened the question for competition among structural engineers and architects to widen the search for realistic designs. By July 1993, 17 structural engineers and 38 architects applied as candidates for the preliminary studies. With the assistance of a multidisciplinary commission, the Administration of Roads selected eight structural engineers for a technical study and seven architects for the architectural study.

Choice of technical design
Simultaneously, a school of international experts representing a wide spectrum of expertise (technical, architectural and landscape), chaired by Jean-François Coste, was established to clarify the choices that had to be made. In February 1995, on the basis of proposals of the architects and structural engineers, and with support of the school of experts, five general designs were identified.

The competition was relaunched: five combinations of architects and structural engineers, drawn from the best candidates of the first phase, were formed; each was to conduct in-depth studies of one of the general designs. On 15 July 1996, Bernard Pons, minister of Public Works, announced the decision of the jury, which was constituted of elected artists and experts and chaired by Christian Leyrit, the director of highways. The solution of a cable-stayed bridge, presented by the structural engineering group Sogelerg, Europe Etudes Gecti and Serf and the architects Foster + Partners was declared the best.

Detailed studies were carried out by the successful consortium, steered by the highways authority until mid-1998. After wind tunnel tests, the shape of the road deck was altered and detailed corrections were made to the design of the pylons. When the details were eventually finalised, the whole design was approved in late 1998.

The Akashi Kaikyō Bridge 

The Akashi Kaikyō Bridge  is a suspension bridge, which links the city of Kobe on the Japanese mainland of Honshu to Iwaya on Awaji Island. It crosses the busy Akashi Strait (Akashi Kaikyō in Japanese) as part of the Honshu-Shikoku Highway.
Carriessix lanes of roadway
CrossesAkashi Strait
LocaleAwaji Island and Kobe
Other name(s)Pearl bridge
Maintained byHonshu-Shikoku Bridge Authority
Characteristics
DesignSuspension bridge
Total length3,911 metres (12,831 ft; 2.430 mi)
Height282.8 metres (928 ft) (pylons)
Longest span1,991 metres (6,532 ft; 1.237 mi)
Clearance below65.72 metres (215.6 ft)
History
DesignerSatoshi Kashima
Construction begin1988
Construction end1998
OpenedApril 5, 1998
Statistics
Toll¥2,300
Akashi Kaikyō Bridge is located in Japan
Akashi Kaikyō Bridge
Location in Japan

Since its completion in 1998,the bridge has had the longest central span of any suspension bridge in the world,[2] at 1,991 metres (6,532 ft; 1.237 mi).

It is one of the key links of the Honshū-Shikoku Bridge Project, which created three routes across the Inland Sea.

History
Before the Akashi Kaikyō Bridge was built, ferries carried passengers across the Akashi Strait in Japan. This dangerous waterway often experiences severe storms, and in 1955 two ferries sank in the strait during a storm, killing 168 people. The ensuing shock and public outrage convinced the Japanese government to develop plans for a suspension bridge to cross the strait. The original plan called for a mixed railway-road bridge, but when construction on the bridge began in April 1988, the construction was restricted to road only, with six lanes. Actual construction did not begin until May 1988, and the bridge was opened for traffic on April 5, 1998.[3]

Structure

Main supporting towers
The bridge has three spans. The central span is 1,991 m (6,532 ft; 1.237 mi),[1] and the two other sections are each 960 m (3,150 ft; 0.60 mi). The bridge is 3,911 m (12,831 ft; 2.430 mi) long overall. The two towers were originally 1,990 m (6,530 ft; 1.24 mi) apart, but the Great Hanshin earthquake on January 17, 1995, moved the towers so much (only the towers had been erected at the time) that the span had to be increased by 1 m (3.3 ft).

The bridge was designed with a two hinged stiffening girder system, allowing the structure to withstand winds of 286 kilometres per hour (178 mph), earthquakes measuring up to magnitude 8.5, and harsh sea currents. The bridge also contains tuned mass dampers that are designed to operate at the resonance frequency of the bridge to dampen forces. The two main supporting towers rise 282.8 m (928 ft) above sea level 112 centimetres (44 in) in diameter।
The Akashi-Kaikyo bridge has a total of 1,737 illumination lights: 1,084 for the main cables, 116 for the main towers, 405 for the girders and 132 for the anchorages. On the main cables three high light discharged tubes are mounted in the colors red, green and blue. The RGB model and computer technology make for a variety of combinations. 28 patterns are used for occasions as national or regional holidays, memorial days or festivities।

Cost
The total cost is estimated at 500 billion yen; it is expected to be repaid by charging drivers a toll to cross the bridge. The toll is 2,300 yen and the bridge is used by approximately 23,000 cars per day. At 2,300 yen/car annual revenue would equal 19.5 billion yen.

The Three Gorges Dam


Country China
Location Sandouping, Yiling, Hubei
Coordinates 30°49′23″N 111°00′12″E
PurposePower, flood control, navigation
StatusOperational
Construction began December 14, 1994
Opening date2003[1]
Construction cost ¥180 billion (US$26 billion)
Owner(s)China Yangtze Power (subsidiary of China Three Gorges Corporation)
Dam and spillways
Type of damGravity dam
Impounds Yangtze River
Height181 m (594 ft)
Length2,335 m (7,661 ft)
Width (crest)40 m (131 ft)
Width (base)115 m (377 ft)
Spillway capacity116,000 m3/s (4,100,000 cu ft/s)
Reservoir
CreatesThree Gorges Reservoir
Total capacity39.3 km3 (31,900,000 acre·ft)
Catchment area1,000,000 km2 (390,000 sq mi)
Surface area1,084 km2 (419 sq mi)[2]
Max. length600 km (370 mi)[3]
Normal elevation175 m (574 ft)
Power station
Commission date2003–2012
Type Conventional
Hydraulic head
Rated: 80.6 m (264 ft)
Maximum: 113 m (371 ft)

Power generation
Nameplate capacity 22,500 MW
Capacity factor 45%
Annual generation 87 TWh (310 PJ) (2015)
Turbines 32 × 700 MW
2 × 50 MW Francis-type
The Three Gorges Dam is a hydroelectric dam that spans the Yangtze River by the town of Sandouping, located in Yiling District, Yichang, Hubei province, China. The Three Gorges Dam is the world's largest power station in terms of installed capacity (22,500 MW). In 2014 the dam generated 98.8 TWh of electricity, setting a new world record by 0.17 TWh previously held by the Itaipú Dam on the Brazil/Paraguay border in 2013 of 98.63. But in 2015, the Itaipu power plant resumed the lead in annual worldwide production, producing 89.5 TWh, while production of Three Gorges was 87 TWh.

Except for a ship lift, the dam project was completed and fully functional as of July 4, 2012,when the last of the main water turbines in the underground plant began production. The ship lift was complete in December 2015.Each main water turbine has a capacity of 700 MW.[13][14] The dam body was completed in 2006. Coupling the dam's 32 main turbines with two smaller generators (50 MW each) to power the plant itself, the total electric generating capacity of the dam is 22,500 MW.

As well as producing electricity, the dam is intended to increase the Yangtze River's shipping capacity and reduce the potential for floods downstream by providing flood storage space. The Chinese government regards the project as a historic engineering, social and economic success, with the design of state-of-the-art large turbines, and a move toward limiting greenhouse gas emissions. However, the dam flooded archaeological and cultural sites and displaced some 1.3 million people, and is causing significant ecological changes, including an increased risk of landslides.The dam has been a controversial topic both domestically and abroad.

Underwater Turbines


Definition
Every day, enough water flows down through rivers and streams to power tons of millions of homes. With the era of big dams halted by the lack of suitable sites as much as environmental concerns, the time for hydrokinetic energy may just be dawning. The ideas of using turbines, or other mechanical devices, to capture the energy of moving water are not a new one. Yet the technology for such hydrokinetic energy has met serious resistance from conditions below the surface. We build ordinary windmills to extract useful power from wind energy. We put turbines in rivers (usually accompanied by dams) to extract useful power from downhill water flow. The second is more "energy intensive" than the first, which is why we all know that dams are great sources of electrical power, while electric-generator windmills spent decades in the economic doldrums (return on investment --ROI-- is relatively tiny, and only recently proved viable on a large scale).
Anyway, putting the equivalent of a windmill in a steady ocean current, say the Gulf Stream, should have an automatically-viable ROI that is intermediate between windmills and ordinary hydropower. This is because water is something like a thousand times denser than air, so a volume of flowing water contains a thousand times the energy of an equal volume of equally-flowing air.
The ocean has different currents at different depths. Near the seafloor underneath the Gulf Stream is another current going the opposite direction. If true, then we can build towers on the seafloor, just like ordinary windmills, to extract power. Being so deep will protect them from ships, and most sea life is found at other depths, so they won't be bothered. Also, another thing that protects sea life is the fact that underwater windmills will have a slow rotation rate, due to that same greater density of water over air. This means we can also put windmills in the rich-life upper ocean currents; animals will have time to dodge the blades.
Renewable Energy
We can divide renewable energy sources into two main categories: traditional renewable energy sources like biomass and large hydropower installations, and the "new renewable energy sources" like solar energy, wind energy, geothermal energy, etc. Renewable energy sources provide 18% of overall world energy , but most of this energy is energy from traditional use of biomass for cooking and heating - 13 of 18%. In large hydropower installations is another three percent. So, when we exclude conventional biomass and large hydropower installations it is easy to calculate that so called "new renewable energy sources" produce only 2.4% of overall world energy. 1.3% are water heating solutions, 0.8% are different power generation methods, and 0.3% are biofuels. In the future this portion should be significantly increased because the availability of non-renewable sources is decreasing with time, and their damaging influence has significantly increased in the last couple of decades. Sun delivers 15 thousand times more energy to Earth than humanity really needs in this stage, but despite this some people on Earth are still freezing. This fact shows us that we should exploit renewable sources much more and that we do not have to worry about the energy after fossil fuels cease to exist
Underwater Turbines
Tidal stream turbines are often described as underwater windmills. They are driven by the kinetic energy of moving water in a similar way that wind turbines use moving air. The generator is placed into a marine current that typically results when water being moved by tidal forces comes up against, or moves around, an obstacle or through a constriction such as a passage between two masses of land. There are sufficient numbers of such fast-flowing underwater currents around the world to make this form of marine renewable energy worth pursuing.
underwater turbines during operationg and non operationg condition
Tidal flows have the advantage of being as predictable as the tides that cause them; both in terms of timing and in judging their maximum velocity. This long-term predictability helps greatly in electricity generation, enabling efficient grid management. The tidal turbine is bolted to the floor of the Kvalsund channel and is connected to the nearby town of Hammerfest’s power grid on September 20th. This is the first time in the world that electricity directly from a tidal current has been feed into a power grid. The gravitational tug of the moon produces a swift tidal current there that cause though the channel at about 8 feet (2.5 meters) per second and spins the 33-foot (10 meters) long blades of the turbine. The blades automatically turn and rotate at a pace of seven revolutions per minute, which is sufficient to produce 700,000 kilowatt hours of non-polluting energy per year- enough to power about 35 Norwegian homes (70 U.S homes).
Principles
Underwater turbines operate on the same principles that wind turbines use; a flow of fluid moves a set of blades creating mechanical energy which is then converted to electrical energy. They are equally troublesome for environmentalists, as wind turbines interrupt bird flights just as water turbines can disturb underwater life. One advantage water turbines enjoy over other sources of renewable energy is a predictable tide table. MCT's ocean energy device works on the same principles as a windmill, where large underwater rotors, shaped like propellers, are driven by the huge mass of flowing water to be found at certain places in the sea. The technology consists of rotors mounted on steel piles (tubular steel columns) set into a socket drilled in the seabed. The rotors are driven by the flow of water in much the same way that windmill rotors are driven by the wind, the main difference being that water is more than 800 times as dense as air, so quite slow velocities in water will generate significant amounts of power. The energy generated, being derived from tides has the added significant advantage of being predictable.
Conclusion
Ocean energy can play a significant role in our nation’s renewable energy portfolio. With the right support, the ocean energy industry can be competitive internationally. With the right encouragement, ocean renewable energy technologies can help us reduce our reliance on foreign oil – fossil fuels, in general – and provide clean energy alternatives to conventional power generating systems. And with the right public awareness, our coastline communities can use ocean renewables as a springboard for coastal planning that reflects the principles of marine biodiversity.
In conclusion, we believe that the intense and predictable marine current resource offers the possibility of clean energy at a cost that will ultimately be competitive not only with the other renewables, but in the long run we believe we can compete head on with most forms of fossil fuelled power generation at present-day costs. We think that, given appropriate government support to help the technology through its early and immature stages, it can play a significant role in producing clean energy. Tidal energy has potential to become a viable option for large scale, base load generation in Scotland. Tidal Streams are the most attractive method, having reduced environmental and ecological impacts and being cheaper and quicker installed.

High Performance Concrete


Abstract of High Performance Concrete

Concrete is considered as durable and strong material. Reinforced concrete is one of the most popular materials used for construction around the world. Reinforced concrete is exposed to deterioration in some regions especially in coastal regions. Therefore researchers around the world are directing their efforts towards developing a new material to overcome this problem. Invention of large construction plants and equipments around the world added to the increased use of material. This scenario leads to the use of additive materials to improve the quality of concrete. As an outcome of the experiments and researches, cement based concrete which meets special performance with respect to workability, strength and durability known as” High Performance Concrete” was developed. High Performance Concrete can be designed to give optimized performance characteristics for a given set of load, usage and exposure conditions consistent with the requirements of cost, service life and durability. The high performance concrete does not require special equipments except careful design and production. High performance concrete has several advantages like improved durability characteristics and much lesser micro cracking than normal strength concrete.
High performance concrete (HPC) is that which is designed to give optimized performance characteristics for the given set of materials, usage and exposure conditions, consistent with requirement of cost, service life and durability. The American Concrete Institute (ACI) defines HPC ‘‘as concrete which meets special performance and uniformity requirements that cannot always be achieved routinely by using only conventional materials and nominal mixing, placing, and curing practices.” The performance may involve enhancements of characteristics such as placement and compaction without segregation, long-term mechanical properties, and early age strength or service life in severe environments.
Introduction
The American Concrete Institute (ACI) defines HPC ‘‘as concrete which meets special performance and uniformity requirements that cannot always be achieved routinely by using only conventional materials and nominal mixing, placing, and curing practices.” The performance may involve enhancements of characteristics such as placement and compaction without segregation, long-term mechanical properties, and early age strength or service life in severe environments. High performance in a broad manner can be related to any property of concrete. It can mean excellent workability in the fresh state like self-leveling concrete or low heat of hydration in case of mass concrete, or very rigid setting and hardening of concrete in case of sprayed concrete or quick repair of roads and airfields, or very low imperviousness of storage vessels, or very low leakage rates of encapsulation containments for contaminating material.
Also, the concrete must have a durability factor greater than 80 after 300 cycles of freezing and thawing to meet their definition. "All high-strength concrete is high-performance concrete, but not all high-performance concrete is high-strength concrete," says Henry G. Russell, consulting engineer and former chairman of the American Concrete Institute's high-performance concrete committee. High-performance concrete (HPC) is not one product but includes a range of materials with special properties beyond conventional concrete and routine construction methods. Any concrete which satisfies certain criteria proposed to overcome limitations of conventional concretes may be called High Performance Concrete.
It may include concrete, which provides either substantially improved resistance to environmental influences or substantially increased structural capacity while maintaining adequate durability. It may also include concrete, which significantly reduces construction time to permit rapid opening or reopening of roads to traffic, without compromising long-term serviceability. Therefore it is not possible to provide a unique definition of High Performance Concrete without considering the performance requirements of the intended use of the concrete
Objectives
To put the concrete in to service at much earlier age, for example opening the pavement at 3-days.
To build high-rise buildings by reducing column sizes and increasing available space.
To build the superstructures of long-span bridges and to enhance the durability of bridge decks.
To satisfy the specific needs of special applications such as durability, modulus of elasticity, and flexural strength. Some of these applications include dams, grandstand roofs, marine foundations, parking garages, and heavy industrial floors.
General Characteristics
High-performance concrete characteristics are developed for particular applications and environments; some of the properties that may be required include:
High strength
High early strength
High modulus of elasticity
High abrasion resistance
High durability and long life in severe environments
Low permeability and diffusion
Resistance to chemical attack
High resistance to frost and deicer scaling damage
Toughness and impact resistance
Volume stability
Ease of placement
Compaction without segregation
Inhibition of bacterial and mold growth
Advantages of High Performance Concrete
The advantages of using high strength high performance concretes often balance the increase in material cost. The following are the major advantages that can be accomplished.
Reduction in member size, resulting in increase in plinth area/useable area and direct savings in the concrete volume saved.
Reduction in the self-weight and super-imposed dead load with the accompanying saving due to smaller foundations.
Reduction in form-work area and cost with the accompanying reduction in shoring and stripping time due to high early-age gain in strength.
Construction of High –rise buildings with the accompanying savings in real-estate costs in congested areas.
Longer spans and fewer beams for the same magnitude of loading.
Reduced axial shortening of compression supporting members.
Reduction in the number of supports and the supporting foundations due to the increase in spans.
Reduction in the thickness of floor slabs and supporting beam sections which are a major component of the weight and cost of the majority of structures.
Superior long-term service performance under static, dynamic and fatigue loading.
Low creep and shrinkage.
Greater stiffness as a result of a higher modulus of elasticity
Higher resistance to freezing and thawing, chemical attack, and significantly improved long-term durability and crack propagation.
Reduced maintenance and repairs.
Smaller depreciation as a fixed cost.
Limitations
High Performance Concrete has to be manufactured and placed much more carefully than normal concrete.
An extended quality control is required
In concrete plant and at delivery site, additional tests are required. This increases the cost
Some special constituents are required which may not be available in the ready mix concrete plants.
Conclusion
The design of HPC is met when materials are optimized to produce a strong durable concrete.
The water, cementitious materials, aggregates and chemical admixtures all need to be proportioned effectively to deliver the mix with the most desirable properties for placement, finishing, curing, and hardened condition.
The designs are not cook book and in most cases require that the mix be trial batched to compare the fresh and hardened properties.
As mentioned earlier in this section, the designer needs to be innovative with his materials and the proportioning of these materials.
Once the mix has been designed and prepared, ensure that enough material is available to make additional tests for durability.